Who signs
Owner-operated
Roman Ivakhnenko runs the company and writes every estimate. Licensed trade partners handle the mechanical work. One name is on the contract.

Residential general contractor, Orange Village, Ohio
Kitchens, baths, basements, decks, and additions in twelve suburbs. You get an itemized written estimate, the permit is filed before anything comes apart, and the person who wrote the number is the one on the job.
Eight kinds of residential work. Each page says what is in the scope, what is not, which permit it needs, and what moves the price.


Pick the city and the kind of work. The permit path below comes from that page, not from a template.
Pick both and the permit path for that pair appears here, step by step.
Four photographs from a single deck job, shown in the order they were taken. Scroll and the frame goes up the way it did on site.




Twelve cities east of Cleveland, each with its own building department. We register in the city of the house before we pull the permit there.
NIR is registered here. Orange Village Contractor Registration #4235, General, through December 31, 2026.
Citizenserve portal, original surety bond, Architectural Review Board before many building permits.
No credit cards at the Building Department. Front yards stay open. In-ground pools only.
Small village on Chagrin Boulevard. Point-of-sale inspections on transfer. P&Z on the second Tuesday.
Clariti online portal. Construction noise has a clock. Registration lasts one year from issuance.
A Chagrin Falls mailing address is not the Village. Confirm the tax district before anyone pulls a permit.
Estate lots, a published lighting code, ABR Design Guide, GovWell portal.
Inspections by SAFEbuilt, not a village inspector on staff. 24-hour notice.
Registration demands $1,000,000 / $2,000,000 liability naming the City, plus a $25,000 surety bond.
Historic District subcommittee, then ABR, then permit. Work over $3,000 needs an architect’s stamp.
Seventy-five percent of the city sits in a National Register district. Landmark review before a permit on designated fabric.
ABR two Thursdays a month on Zoom. Homeowners may pull their own permit — hired trades still register.
Rendered scene: a tree-lined street of mid-century houses of the kind found east of Cleveland. Not a real street.
Photographs from our own jobs, taken on site. Each caption says what you are looking at and when it was taken.






Who signs
Roman Ivakhnenko runs the company and writes every estimate. Licensed trade partners handle the mechanical work. One name is on the contract.
Insurance
General liability plus contractors errors and omissions. Ohio’s written-contract floor is $250,000. The certificate is attached to your contract.
Registration
Orange Village Contractor Registration #4235, current through December 31, 2026. Permits are pulled in the city of the house, and you can look them up yourself.
Four minutes. City, rooms, budget range, and when you want to start. We reply with a site-visit time, not a number.
Ohio does not issue a statewide license for residential general contractors. Registration is municipal. NIR Solutions is registered in Orange Village, Contractor Registration #4235, General, through December 31, 2026. We register in the city of the house before we pull a permit there.
Then it is a change order you sign before that work starts. On contracts over $25,000, Ohio Revised Code 4722 requires notice before extras that total more than $5,000. We write extras at any size. The estimate you sign is the number we build to.
We do, in the city of the house, after we are registered there. You can look the permit up in that city’s portal. If the city did not stamp it, we do not start it.
NIR carries $1,000,000 general liability plus contractors errors and omissions. Ohio’s written-contract floor is $250,000 GL on jobs over $25,000. The certificate is attached to the contract.