Shaker Heights, Ohio

Home additions in Shaker Heights

Shaker Heights wants paper before it wants a footprint: an annual contractor license through CitizenServe, insured with the City listed at $500,000/$1,000,000 bodily injury or $2,000,000 aggregate and $50,000 property damage.

Brick basement walls with new framing and two windows.
Brick walls, new framing, two windows, July 2026

Three quarters of the city sits inside the Shaker Village listing on the National Register of Historic Places, which is a statistic the city publishes rather than a permit counter. The list that can stop a dumpster is the local one: individual landmarks and the Winslow Road and Shaker Square districts take Landmark Commission review before a building permit. Most exterior changes elsewhere in the city still reach the Architectural Board of Review through the same portal.

On an addition that means the pre-application meeting with the Planning department at 216-491-3216 is a scheduled step on Landmark work, not a courtesy call. The city publishes Window Standards and Shaker Village Colors, so the sash and the color on a new elevation are chosen against documents that already exist. Roman writes those documents into the estimate the same way he writes framing.

The photographs on this page are from our own jobs on Cleveland’s east side. Each caption says what is in the frame and when. None is presented as work in Shaker Heights.

The permit path in Shaker Heights

  1. License the contractorThe city issues an annual contractor license through CitizenServe, with the certificate of insurance listing the City at the published minima. NIR Solutions holds Orange Village Contractor Registration #4235, a municipal registration that does not carry across the city line, so the Shaker Heights license is taken out before any application goes in. Interior-only work still needs it.
  2. Pre-application, then LandmarkLandmark work starts with the required pre-application meeting with the Planning department at 216-491-3216. Commission review comes before the building permit on individual landmarks and inside the Winslow Road and Shaker Square districts. Skipping that meeting to save a week is how a month goes missing.
  3. The board sees the elevationMost exterior changes citywide go to the Architectural Board of Review on the same portal, even off the landmark lists. An addition changes an elevation by definition, so the board sees it. Window Standards and Shaker Village Colors are the documents that settle the argument about sash and color.
  4. Permit, then the inspection holdsThe building permit follows review, not the other way around. From there the sequence is footing, foundation, rough trades, framing, insulation, and final. Drawings that already answer the standards move through this part. Drawings that treat the standards as a suggestion go back to a meeting.

A sash picked from a catalog is not an argument against a published standard.

What Shaker Heights houses do to a home addition estimate

Tudors and colonials from the Van Sweringen plan, plaster on lath, original wood windows, brick chimneys, and slate or asphalt laid over older roofing. A new wing has to meet all of that at one junction. The header over the connecting opening, the plaster that will crack around it, and the flashing where a new roof dies into old brick are separate lines on the estimate, because they are separate problems with separate trades.

Interiors hide what drawings do not show: knob-and-tube in a wall, a bath added at some point without a permit, a wet wall and a chimney standing exactly where the opening wants to be. We look during the site measure and write those as conditions with numbers on them. Single-family and two-family fabric is the work here. Apartment buildings at the Rapid are a different practice.

Questions from Shaker Heights

Our house is not a landmark. Does a Shaker Heights addition still get reviewed?

Almost certainly. Most exterior changes citywide reach the Architectural Board of Review through the same portal, whether or not the address appears on a landmark list. Landmark Commission review is the extra layer for individual landmarks and for the Winslow Road and Shaker Square districts, and that layer brings the required pre-application meeting with it.

Can we choose the windows for the new wing ourselves?

You choose the room they light. The sash on a reviewed elevation gets specified against the city's published Window Standards, and a unit bought first tends to be a unit redrawn later. We bring the standard into the selection conversation, price what satisfies it, and leave the choosing where choice actually lives.

How long is the Shaker Heights contractor license good for?

A year, through CitizenServe, with insurance listing the City at the published bodily-injury and property-damage minima. It renews annually, which matters on an addition that runs across a renewal date. We keep it current rather than letting a lapse hold up a footing inspection on a job that is already open.

What does a National Register listing on most of the city mean for our project?

By itself, not much. The listing is a citywide statistic the city publishes, and it does not review drawings. What reviews drawings is the local layer: the Landmark Commission on designated fabric and in the two local districts, and the board on most exterior work elsewhere. We schedule around the local list, because that is the one with meeting dates.

Request an estimate in Shaker Heights

Four minutes. Rooms, budget range, and when you want to start. We reply with a site-visit time, not a number.

The number reaches Roman Ivakhnenko, who writes every estimate. Texts get a reply with a site-visit time.

Estimate request

Orange Village Contractor Registration #4235


Twenty words is enough. City, rooms, and what is wrong.

No trackers on this sheet. A draft stays in this browser until you send it. Ohio Revised Code 4722 on jobs over $25,000: written contract, 10% down cap.