Hunting Valley, Ohio

Bathroom remodeling in Hunting Valley

Hunting Valley publishes an ABR Design Guide and a lighting code, both about the outside of a house. A bath rarely touches either, and it still files on GovWell, as a complete electronic set, to a registered prime.

Finished bathroom with large-format wall tile to the ceiling and a tiled floor.
Finished bathroom: wall tile to the ceiling, matching floor, June 2026

A bathroom that keeps its walls and its window changes nothing the Design Guide or the lighting code governs. That does not take it out of the village. An interior-only job here still means registering with the village and pulling what the trades call for; a large lot is not an exemption. For a bath that is a plumbing permit and often an electrical permit, applied for on GovWell and issued to NIR as the registered prime contractor. Roman Ivakhnenko writes the scope; a licensed plumbing trade partner does the rough and the trim under that permit.

The estimate keeps waterproofing and the plumbing inspection apart, because that is where bath work fails. The membrane or pan, the valve, the fan and where it terminates, the tile, and each village hold are written as separate lines. Whether the existing trap, vent, and supply can stay is decided on paper before demolition. The waterproofing is not a finish choice; the slope to the drain and the pan are written before the tile is chosen. Estimates are requested at info@nircontracting.com; NIR has no showroom and no public street address.

The photographs on this page are from our own jobs on Cleveland’s east side. Each caption says what is in the frame and when. None is presented as work in Hunting Valley.

The permit path in Hunting Valley

  1. Confirm the house is in Hunting ValleyCounty Line Road is a boundary, and Squire Valleevue borders the village without being a shortcut to a permit. The house is in Hunting Valley or it is not. If it is, the village wants GovWell, its Design Guide, and its lighting code, and it wants NIR registered there before the permit: registration #4235 is Orange Village’s and municipal, and Ohio issues no statewide license for residential general contractors.
  2. Register with the village on GovWellContractor registration in Hunting Valley runs through GovWell at app.govwell.com/hunting-valley, the same portal as the permit, ABR, and Planning & Zoning. Paper dropped at the desk without the portal is not a filing. The registration goes in first; the permit application follows it on the same portal, and the village issues that permit to NIR as the registered prime.
  3. Settle the permit, upload the setMoving the toilet, shower, or fan, or opening a wet wall, takes a plumbing permit and often an electrical one. That is settled before demolition. Building Department: 440-247-2805 reaches Michael Clements at the village, Monday through Friday, 8:00 a.m. to 4:00 p.m. The set uploads as electronic construction documents, complete.
  4. ABR first if the elevation changesA bath that stays inside its walls does not go to the board. A new window or a bump-out does: those drawings go to ABR on GovWell, drawn to the village’s Design Guide, ahead of the building permit. A bump-out is an addition, and exterior lighting on an addition is a code item here, so fixture and shield are specified on the estimate.
  5. Holds before tileThe village’s inspector works to the Residential Code of Ohio, and each hold is booked under the permit issued to NIR. The plumbing inside the wall is looked at first; the pan or membrane is checked where the village’s inspector wants to see it before it is covered; the rough electrical for the fan, lighting, and GFCI follows; the final closes the permit. Tile waits on the signed holds.

The estimate names the path, interior-only or ABR first, and carries the registration, the GovWell filing, and each hold as separate lines.

What Hunting Valley houses do to a bath estimate

A Hunting Valley house is custom and sits far from the next one; the production ranch barely exists here. The first line asks whether the fixtures stay on the existing rough-in or the room is reconfigured; moving the waste puts the room below in play, a basement ceiling or a kitchen. What a custom wet wall hides is not known until it is opened; galvanized supply, a drum trap, or a fan that emptied into the attic are priced when seen, then signed.

Inside, a house here can be plain; the envelope and the grounds are where the village looks, and a bath that stays behind its own walls is the plain kind. A primary bath in a wide custom room often wants a curb-less pan: floor build-up and a door that may stop clearing, measured before the tile format is chosen. A lower-level bath inherits the basement’s problem, and here that is grade and the river, not a missing drain in a 30-foot side yard.

One bathroom, cement board to grout

Five photographs from a single bathroom, in order: the backer board, the waterproofing membrane, the tile layout, the tile set, the grout.

  1. Cement board walls around a tub, before waterproofing.
    01 / 05Cement board walls around a tub before waterproofing, April 2026
  2. Tub surround and floor coated in red liquid waterproofing membrane before tile.
    02 / 05Tub surround and floor coated with waterproofing membrane before tile, April 2026
  3. Plank tile laid out on red membrane with spacers, tub at the back.
    03 / 05Floor tile laid out on membrane with spacers, April 2026
  4. Plank floor tile set with orange spacers, tub in place, walls still red membrane.
    04 / 05Plank tile set with spacers, tub in place, April 2026
  5. Bathroom floor tile grouted, wall tile partly set around the tub.
    05 / 05Floor tile grouted, wall tile in progress, April 2026

Questions from Hunting Valley

Does an interior-only bath in Hunting Valley need a permit?

If the toilet, shower, or fan moves, or a wet wall opens, yes: a plumbing permit and usually an electrical one, applied for on GovWell. Cosmetic tile over tile with no rough-in may not.

Can I pull the permit myself for a Hunting Valley bath?

Not as the village writes it. Hunting Valley issues permits to registered prime contractors, and an owner holding a sketch is not one. NIR registers with the village on GovWell and holds the permit as prime; the licensed plumbing and electrical trade partners work under it.

What if the bath wants a new window or a bump-out?

Then the order changes. The drawings go to ABR on GovWell against the published Design Guide before any building permit. A bump-out is an addition, so an exterior fixture on it falls under the lighting code and is specified on the estimate.

Who at the village answers a Hunting Valley bath permit question, and what has to be in the upload?

Michael Clements at the Building Department, 440-247-2805, Monday through Friday, 8:00 a.m. to 4:00 p.m. The upload is electronic construction documents, which means a complete set uploaded to GovWell, not a sketch photographed on a phone.

Request an estimate in Hunting Valley

Four minutes. Rooms, budget range, and when you want to start. We reply with a site-visit time, not a number.

The number reaches Roman Ivakhnenko, who writes every estimate. Texts get a reply with a site-visit time.

Estimate request

Orange Village Contractor Registration #4235


Twenty words is enough. City, rooms, and what is wrong.

No trackers on this sheet. A draft stays in this browser until you send it. Ohio Revised Code 4722 on jobs over $25,000: written contract, 10% down cap.