Cleveland Heights, Ohio

Bathroom remodeling in Cleveland Heights

Cleveland Heights files on CitizenServe and holds its board online: ABR meets the second and fourth Thursday, 4:00 to 6:00 p.m. A bath that stays inside never sees that calendar; a bath that swaps its window waits for it.

Finished bathroom with large-format wall tile to the ceiling and a tiled floor.
Finished bathroom: wall tile to the ceiling, matching floor, June 2026

Cleveland Heights is early-twentieth-century housing on tight lots, much of it two-families, and plaster on lath by default. The wet wall behind the tile is plaster on wood lath, and it comes off as a line on the estimate, not a surprise. The city allows an owner of an occupied 1–3 family to pull a homeowner permit for some work, with two limits that matter in a bath: no connection to public utilities, and no cover for a hired plumber. Both go on Roman’s estimate, next to the lath.

Two things sink a bath: water that gets past the tile, and a plumbing inspection nobody called in. Open a wet wall in an early-twentieth-century house and you often find galvanized supply, a drum trap, or a fan that has been dumping into the attic, with knob-and-tube in the same wall. The estimate carries the membrane or pan, the valve, the fan and where it terminates, the tile, and each city hold as a separate line. Nothing hides inside the tile number.

The photographs on this page are from our own jobs on Cleveland’s east side. Each caption says what is in the frame and when. None is presented as work in Cleveland Heights.

The permit path in Cleveland Heights

  1. Register with the cityCleveland Heights runs its own contractor registration: a $10,000 surety bond on the city’s form and liability insurance with the city as additional insured, typically $100,000/$300,000 bodily injury and $50,000 property damage. Orange Village registration #4235 does not carry over. NIR registers, and so does each trade partner on the permit.
  2. Confirm which permits the bath needsOnce the bath moves a toilet, shower, or fan, or opens the wet wall, it is plumbing-permit and usually electrical-permit work, and the hired plumber cannot sit under a homeowner permit. Tile over tile with no rough-in may need neither. Roman confirms it with the Cleveland Heights building department before demolition is scheduled.
  3. Go to ABR if the elevation changesAn interior-only bath skips the board. A new or replaced window or a bump-out goes to ABR before the building permit. The board meets the second and fourth Thursday, 4:00 to 6:00 p.m., online. A filing after the work is done is charged at three times the fee.
  4. File on CitizenServeCitizenServe is the Cleveland Heights portal. The plumbing and electrical permits are filed there under the registered contractors, not under a homeowner permit, which does not cover a hired plumber or electrician. Demolition is not scheduled until the permit is issued.
  5. Rough-in, holds, then finishDemolition, substrate, waterproofing, and the rough plumbing and electrical come first, then the city’s holds: in-wall plumbing, the pan or membrane check where the city asks for it, rough electrical. No tile until each hold is signed off. Then tile, fixtures, paint, and the final inspection, punched against the signed estimate.

The estimate names each permit, each registration, and whether ABR applies.

What Cleveland Heights houses do to a bath estimate

A hall bath is often a stacked wet wall. If the waste has to move, the kitchen or basement ceiling below is in play, and in a two-family that ceiling may belong to the other unit. An unfinished basement is the one favor these houses do a plumber: the drain can be reached without opening a finished ceiling. A damp one is written down as a condition before the plumbing trade partner prices the rough-in.

A primary bath is a wider room, and a pan that goes curb-less brings floor build-up and a door that may no longer clear. If the plan replaces or enlarges one of the original wood windows, the job is an exterior change and goes to ABR. Tight lots mean the household next door hears the compressor; the schedule follows Cleveland Heights’ own process, not Beachwood’s noise clock.

One bathroom, cement board to grout

Five photographs from a single bathroom, in order: the backer board, the waterproofing membrane, the tile layout, the tile set, the grout.

  1. Cement board walls around a tub, before waterproofing.
    01 / 05Cement board walls around a tub before waterproofing, April 2026
  2. Tub surround and floor coated in red liquid waterproofing membrane before tile.
    02 / 05Tub surround and floor coated with waterproofing membrane before tile, April 2026
  3. Plank tile laid out on red membrane with spacers, tub at the back.
    03 / 05Floor tile laid out on membrane with spacers, April 2026
  4. Plank floor tile set with orange spacers, tub in place, walls still red membrane.
    04 / 05Plank tile set with spacers, tub in place, April 2026
  5. Bathroom floor tile grouted, wall tile partly set around the tub.
    05 / 05Floor tile grouted, wall tile in progress, April 2026

Questions from Cleveland Heights

Can I pull my own permit for a bathroom remodel in Cleveland Heights?

If you own and occupy a 1–3 family, the city lets you pull a homeowner permit for the work it allows. Two limits matter in a bath: the permit does not cover connecting to public utilities, and it does not cover the plumber or electrician you hire, who register with the city themselves.

My bathroom window in Cleveland Heights is original wood. Can it be replaced during the remodel?

It can, as an exterior change with its own path. In Cleveland Heights windows go to ABR before the building permit, whether the sash is replaced or the opening changes. An interior-only bath does not go to the board. Roman writes which path the job is on into the estimate, and the window waits for the board.

The bath window in my Cleveland Heights house was swapped before the remodel. Does ABR still see it?

It can, and at three times the fee. Cleveland Heights charges retroactive ABR on work already done at 3x, which is the city telling you not to start the elevation and ask later.

Who does the plumbing on a Cleveland Heights bath, and whose name is on the contract?

Roman Ivakhnenko writes the scope and runs the job. A licensed plumbing trade partner does the rough and trim; a licensed electrical trade partner does the fan, lighting, and GFCI on the city’s inspection list. The contract carries one name, NIR Solutions LLC, with the certificate for $1,000,000 general liability plus contractors errors and omissions attached.

Request an estimate in Cleveland Heights

Four minutes. Rooms, budget range, and when you want to start. We reply with a site-visit time, not a number.

The number reaches Roman Ivakhnenko, who writes every estimate. Texts get a reply with a site-visit time.

Estimate request

Orange Village Contractor Registration #4235


Twenty words is enough. City, rooms, and what is wrong.

No trackers on this sheet. A draft stays in this browser until you send it. Ohio Revised Code 4722 on jobs over $25,000: written contract, 10% down cap.