Two boards run a Solon whole-house job on two calendars: the building department review of 7 to 10 business days, and, where a subdivision has covenants, an association that can refuse an elevation the city already stamped.

Solon reviews a permit in about 7 to 10 business days, and it will not start counting until every subcontractor listed on the application is already registered. On a whole-house renovation that means the plumbing, electrical, and HVAC partners are named the week the drawings are done, not found in week three. A trade added later restarts a clerk's check.
The other calendar is private. Grantwood and subdivisions like it review elevations, colors, and materials through an association board, and a city stamp is not an association approval. Households have bought shingles that came back rejected. Both submittals go on the schedule before demolition, because the slower one sets the start date. Painting, wallpaper, and same-size floor covering typically need no permit at all, which explains why the last weeks of a renovation carry no inspections.
The photographs on this page are from our own jobs on Cleveland’s east side. Each caption says what is in the frame and when. None is presented as work in Solon.
The permit path in Solon
- Register with the City of SolonNIR Solutions holds Orange Village Contractor Registration #4235 and registers in the city of the house before pulling a permit there, so Solon comes first on a Solon address. The city asks for liability at $1,000,000 each occurrence and $2,000,000 aggregate naming the City as additional insured, a sealed $25,000 registration bond, and a $100 fee.
- Name the subcontractorsEvery subcontractor listed has to be registered before the permit issues. A whole-house scope carries several, so they go on the application together. Adding a plumber afterward puts the file back in front of the clerk on the city's schedule rather than the framing schedule.
- File to Permit@Solonohio.orgApplications go to Permit@Solonohio.org, and review typically runs 7 to 10 business days. Simplified forms exist for reroof, siding, windows and doors, and furnace or AC replacement, so parts of a renovation can move on the short form while walls that relocate go through full review.
- Clear the association before demolitionWhere covenants apply, the board reviews what the street sees on its own meeting calendar. We submit there first, because a monthly meeting is slower than a business-day count. The estimate carries both dates, and the start follows the later one.
Homeowners may do work on premises they occupy if they are not in the trade, and a hired contractor still registers.
What Solon houses do to a whole-home renovation estimate
The stock runs from the 1970s onward, production and custom, so walls are gypsum and the framing is predictable. The surprises are downstairs. A prior owner finished part of a basement, sometimes without a permit, and a whole-house scope has to decide in writing whether that work gets opened, corrected, and inspected or left alone and excluded.
Envelope arrives with the interior because the stock aged together. Siding, windows, and roofing reach the end of their run within a few years of each other, so one estimate often carries all three. That is where the short applications earn their keep, and also where an association has the most to say, since each of those lines changes the elevation.
Questions from Solon
Our subdivision has an architectural board. Does the Solon permit settle it?
No. The city reviews code; the association reviews what the street sees, and it can refuse a color or a shingle the building department already stamped. We file with the board first because its meeting cycle is slower than the city's review, and both approvals sit on the schedule.
Can part of a whole-house job in Solon use the simplified applications?
Some of it. Short forms cover reroof, siding, windows and doors, and furnace or AC replacement. If the renovation re-roofs and re-sides the house, those parts can move on the short form while the interior goes through full review. A kitchen that relocates walls and plumbing does not qualify.
The basement was finished before we bought the house. Does that come into the scope?
It gets answered either way. If the earlier work was never inspected, opening it puts it in front of the city, and corrections get priced as their own lines. Leaving it alone is a written exclusion. What does not work is building around it and hoping the final inspection looks elsewhere.
Is the $25,000 bond something we pay?
No. The registration bond and the $100 fee are the contractor's, filed with the City of Solon before a permit is pulled on your address. What lands on your estimate is the permit, the review window it needs, and any association submittal. Those get named rather than folded into a round number.
Whole-home renovation nearby
Other work in Solon
Whole-Home Renovation: the full scope and Solon: the permit path.
Request an estimate in Solon
Four minutes. Rooms, budget range, and when you want to start. We reply with a site-visit time, not a number.
The number reaches Roman Ivakhnenko, who writes every estimate. Texts get a reply with a site-visit time.